Early Bird - the Full Version is $19 right now, before it goes to $39. See pricing →

Needlework Studio

Design patterns, organize your floss, and track every stitch, all in one app.

Needlework Studio showing a floral wreath cross-stitch pattern in thread view, with every stitch rendered as real floss

Features

Everything you need, from designing a chart to finishing the piece.

Pattern editor with drawing tools

Pattern Editor

Draw with pencil, fill, shapes, and text in every stitch type: full and part crosses, backstitch, French knots, and beads. Replace a color across the whole chart, drop part of a photo straight onto the grid as stitches, and blend up to three threads.

A 'Finally Home' cottage sampler open in the pattern viewer's chart mode, with the color legend

Pattern Viewer

Switch between chart mode, with clear symbol overlays, and thread mode, with realistic floss rendering. A resizable color legend, per-color progress tracking, and smooth zoom keep your place whether you are planning a design or stitching straight from the screen.

A photo of a sunflower converted into a cross-stitch pattern in the app's Image Converter, shown in thread view

Image Converter

Upload any photo and convert it to a cross-stitch pattern. Adjust grid size, color count, contrast, brightness, and crop. Convert a photo to a cross-stitch pattern →

A black-and-white symbol chart on the stitching canvas, partly stitched over in color

Stitch Over Any Chart

Bring in any cross-stitch chart PDF as a layer you stitch over, even scanned charts or photos of charts that other apps can't open. Line it up with the canvas in a click, then stitch and track your progress straight from the screen.

And everything else that makes it all-in-one

The practical tools that round out the app.

Import & Export

Move patterns in and out freely: JSON, OXS, images, PDF, PNG, SVG, and HTML. Blend threads survive every format.

Materials Calculator

Exact floss and fabric for any pattern: skeins to buy, fabric cut size, and per-color counts.

Thread Inventory

Track 744 DMC, 441 Anchor, and 371 Mill Hill colors, plus your own custom and hand-dyed threads.

Progress Tracking

Mark every stitch as you go, with per-color progress. The full version adds hours stitched, your streak, and an estimated finish date.

Your Pattern Library

A searchable gallery of your patterns, sorted by status, so your whole collection stays in order.

Sync & Share

Open and stitch on a phone, tablet, or second computer over Wi-Fi. Scan a QR code to pair, and your progress and history follow your account.

Works Everywhere

Mac, Windows, and Linux, so you can stitch on whatever computer you already have.

Themes

Preset themes plus your own, with an in-app color picker in light or dark.

What stitchers are saying

An all-in-one solution for patterns, mark up, and inventory. Does the job of several different apps, in one convenient place.

Ruby, beta tester

I love the inventory feature. Being able to track my floss right inside the pattern app is fantastic.

Alchemist's Fire, beta tester

Its creator deeply cares about the people using it. The updates truly listen to users' feedback.

Micky, beta tester

Pricing

Download free and upgrade when you're ready. One-time purchase, no subscription ever.

Start here

Free

Everything you need to try designing & stitching your first patterns.

$0forever
  • 10 saved patterns
  • Canvas up to 300×300
  • Full, half, quarter, three-quarter, petite, backstitch
  • 9 drawing tools
  • PNG (watermarked), JSON export
  • JSON & OXS pattern import
  • Image-to-pattern (75×75, 30 colors)
  • Thread inventory (50 threads)
  • Progress tracking
Download Free

For households & groups

Full + Server

Self-host on your own server. Multi-user, admin panel, and desktop sync.

$49one-time · goes to $79 later
  • Everything in Full Version
  • Self-hostable server (Docker)
  • Multi-user support
  • Admin panel
  • Desktop-to-server sync
  • Server backup & restore
  • Access patterns from any device
Get Full + Server

Full feature comparison

Download

Free to use on any platform. No account required. Works offline.

macOS

Apple Silicon (M1 or later)

Download .dmg

Windows

64-bit installer

Download .exe

Linux

Download .AppImage

Self-Hosted Server

Docker, multi-user

Deployment guide

Documentation

Guides, tutorials, and reference for every feature.